Understanding Projects in Viaesys
A Project is the operational stage of work that begins after an Estimate has been approved by a customer and formally converted.
While an Estimate represents a proposal, a Project represents active, ongoing work. Projects contain the scheduling, ticketing, costing, and billing information needed to carry out, manage, and track work through completion.
At the project level, teams can manage:
Area | What It Controls |
Service Groups | The services, materials, and equipment included in the work |
Tickets | Individual scheduled or unscheduled job visits |
Scopes | Preplanned work without fixed dates |
Scheduling | When job tickets should occur |
JobTrack Activity | Field user job starts, submissions, materials, and equipment usage |
Contract Invoices | Billing schedules and contract invoice setup |
Actual Costs | Labor, material, and equipment costs captured from completed work |
Estimate vs. Project
Estimate | Project |
A proposal sent to the customer | Active work after approval |
Used to calculate pricing, quantities, and visits | Used to schedule, complete, cost, and bill work |
Contains estimated labor, materials, equipment, and contract pricing | Contains tickets, scopes, actual job data, invoices, and project-level costs |
Must be approved before conversion | Created after an approved estimate is converted |
Key idea: Estimates help you sell the work. Projects help you execute and track the work.
Converting an Estimate to a Project
Prerequisites
Before converting an estimate into a project, make sure the following conditions are met:
The estimate must be in an Approved status, or in a custom status where Convert to Project is enabled.
The project start and end dates should be reviewed and confirmed before conversion.
Note: By default, only the Approved estimate status allows conversion to a project. Each organization can customize its estimate status list by adding, renaming, archiving, or configuring statuses that permit conversion.
Initiating the Conversion
Once the estimate is in an approved status, the Convert to Project button becomes available.
Clicking Convert to Project opens a configuration dialog where you can review and confirm important project settings before the project is created.
Conversion Settings
Project Dates
Review and confirm the project start date and end date.
These dates determine the active window for the project and are especially important for automatic project association.
Important: Project dates control whether jobs started from the field can automatically link to the project.
Tax Codes
You can optionally assign:
Tax Code Field | Purpose |
Default Tax Code | Applies the standard tax code to the project |
Exempt Tax Code | Used when certain items or customers are tax exempt |
If your organization does not use tax codes, these fields can be ignored.
Scheduling Options
For each service group in the estimate, choose how the system should create work items.
Option | What It Does | Best Used For |
Do Not Schedule | No tickets or scopes are created automatically | Work that will be configured manually later |
Tickets | Creates individual job tickets based on the estimated number of visits | Regular recurring work with fixed or expected visits |
Scope | Creates a reusable scope instead of individual tickets | Seasonal, unpredictable, or unscheduled work |
Tickets vs. Scopes
Tickets | Scopes |
Represent individual job visits | Represent planned work without fixed dates |
Can be scheduled on specific dates | Have a set number of visits but no set schedule |
Field users can complete them in JobTrack once scheduled and assigned | Can later be converted into tickets |
Best for recurring or date-based work | Best for flexible or seasonal work |
Example:
Use Tickets for recurring lawn maintenance.
Use Scopes for spring cleanup, fall cleanup, or snow and ice removal where exact dates may depend on weather or site conditions.
Assigning Users
If you already know which field user will perform the work, you can assign them during conversion.
You can also assign users later at the individual ticket level.
Contract Invoices
If the estimate includes a contract, you can set up the billing schedule during conversion.
Field | Description |
Total Contract Amount | Pulled automatically from the estimate |
Number of Invoices | Number of billing installments |
Billing Frequency | Monthly, bi-monthly, weekly, or bi-weekly |
Start Date | First billing date |
Contract Service | Optional QuickBooks service code for accounting integration |
Example
If a six-month seasonal contract is billed monthly, you may enter:
Setting | Example |
Number of Invoices | 6 |
Billing Frequency | Monthly |
Start Date | May 1 |
The system will automatically generate the billing date series.
Note: Billing dates are independent of project dates.
A project may end on October 31 while billing continues into November or later. This is similar to completing work and invoicing the customer the following week.
Quantity Adjustment Factors
When estimating, quantities are often set on the higher side to avoid underestimating material or labor needs.
The adjustment factor allows the system to scale down estimated quantities when creating the project. This gives a more realistic cost picture while keeping the original proposal figure intact.
Example
If the estimate includes 75 bags of mulch per visit, but the team realistically expects to use fewer, the adjustment factor can reduce the quantity in the project without changing the original estimate presented to the customer.
Use this when:
You want the estimate to remain customer-facing and conservative, but want project costs to better reflect expected usage.
Project Structure After Conversion
After conversion, the project is organized into service groups.
Service Groups
Service groups contain the services, materials, and equipment that were defined in the original estimate.
If a field user adds materials or equipment during a job that were not originally included in the estimate, those items are automatically added to the project’s service group configuration.
Actions
Actions determine whether a service group will be managed through Tickets, Scopes, or both.
In the project view, each service group has an action represented by the blue gear icon. Services must be actioned in order to turn them into tickets or scopes.
Action Type | Result |
Ticketed | Creates job tickets for individual visits |
Scoped | Creates a scope for planned but unscheduled work |
Both | Allows the service to support both workflows |
Best practice: Although a service can support both tickets and scopes, it is usually better to choose the primary method that best matches the workflow.
Tickets
Tickets represent individual job visits.
After conversion, tickets may be created automatically, but they are initially unscheduled unless scheduling has been configured. Tickets must be scheduled before field users can see and act on them in JobTrack.
Key Ticket Properties
Ticket Property | Source |
Estimated Hours | Copied from the estimate labor quantity |
Estimated Man-Hours | Copied from the same estimate field |
Materials | Pre-populated from the estimate |
Equipment | Pre-populated from the estimate |
Note: Because estimates do not have separate fields for “estimated hours” and “estimated man-hours,” both are set to the same value when tickets are created.
Example
If a visit requires 3 crew members working 4 hours each:
Field | Value |
Estimated Duration | 4 hours |
Estimated Man-Hours | 12 man-hours |
Users can manually adjust estimated hours on individual tickets after conversion to better reflect crew size and job duration.
Scopes
Scopes are preplanned on a site but do not have scheduled dates.
Unlike tickets, scopes do not represent a specific job visit on a specific day. Instead, they represent a set number of visits or planned work that can be converted into tickets later.
Scopes can be converted to individual tickets at any time from the project view. Tickets can also be converted back into scopes if needed.
Scheduling Tickets
Accessing the Schedule Tool
To schedule tickets:
From the portal, go to Scheduling.
Open the Scheduling Calendar.
Click the calendar icon on the right-hand side.
Select the project you want to manage.
From the project scheduling view, click the three dots beside the service group.
You can then choose:
Option | Description |
Schedule Unplanned Jobs | Schedules only jobs that do not currently have a planned date |
Schedule All Jobs | Includes jobs whether or not they already have a planned date |
Planned vs. Unplanned Jobs
Job Type | Description |
Planned Job | Has a planned date assigned |
Unplanned Job | Does not have a planned date assigned |
On the scheduling board, planned jobs are marked with the letter P and show an associated date.
Scheduling Options
Weekly Scheduling
Use weekly scheduling when tickets should recur every week or on specific weeks.
Options include:
Option | Example |
Specific day of the week | Every Wednesday |
Multiple days per week | Monday and Thursday |
Specific weeks of the month | First and third week only |
Month exclusions | Skip June entirely |
Monthly Scheduling
Use monthly scheduling when tickets should occur once per month.
Options include:
Option | Example |
Week of the month | First week, second week, last week |
Day of the week | First Monday, last Friday |
Time Slots
Each day has 24 scheduling slots. A slot indicates the approximate time of day for the visit.
Some organizations may use exact time scheduling instead. In that case, users will see a time-of-day picker instead of slots.
Note: The time slot or exact time setting is controlled at the organization level.
Previewing the Schedule
Before confirming the schedule, use Preview to review the full list of scheduled dates.
This helps verify:
The correct days are selected.
The correct weeks are included.
Excluded months are skipped.
No unintended dates are created.
Important: The scheduler does not automatically account for holidays. Holidays must be manually excluded or adjusted.
JobTrack — Field User Experience
Ticket Visibility
Field users see assigned tickets in the JobTrack app under Jobs.
By default, users can see tickets for:
Visibility Window | Default Setting |
Yesterday | Visible |
Today | Visible |
Tomorrow | Visible |
This date range is an organization-wide setting. It can be configured to show only today or extended to show more days before or after the current date.
Why yesterday is visible:
The one-day-before grace period allows field users to complete a ticket that was deferred from the previous day without the office needing to manually reschedule it.
Site Visibility
Whether a field user can see all sites or only assigned sites is controlled by role-level permissions. Some organizations restrict site visibility to reduce errors and maintain tighter workflow control.
Contact a Viaesys representative if your organization needs to adjust this configuration.
Starting and Submitting a Job
When a field user opens a ticket in JobTrack, they can view:
Estimated hours and man-hours for the visit.
Site information.
Site documents.
Expected materials.
Expected equipment.
To begin work, the field user taps Start Job.
Once started, the ticket appears on the scheduling board in orange, indicating that the job is in progress.
When the work is complete, the field user submits the job.
Materials and Equipment in JobTrack
Materials and equipment configured on the ticket are automatically populated when the job is started.
Field users can:
Action | Description |
Enter quantities used | Record actual material or equipment usage |
Remove unused items | Remove items not used during the job, if enabled by role |
Add new materials or equipment | Add items not originally listed, depending on role permissions |
Restricting Materials and Equipment
Two role-level permissions control whether field users can add items outside the pre-configured list.
Permission | Effect |
Restrict Materials | Users can only use materials already configured on the ticket |
Restrict Equipment | Users can only use equipment already configured on the ticket |
If these restrictions are enabled, field users cannot add materials or equipment outside the ticket’s predefined list.
If restrictions are not enabled, any new material or equipment added during the job is automatically added to the project’s service group configuration for future reference.
Best practice: If using material or equipment restrictions, make sure all expected items are configured before field users go out to the site.
Automatic Project Association
Jobs do not always need to originate from a pre-created ticket or scope.
A field user can start work manually by selecting a Site and tapping Start. The app then displays a list of available services for the field user to choose from.
When this happens, the system attempts to automatically associate the job with an active project.
How Automatic Project Association Works
The system looks for a project where:
Requirement | Description |
Matching Service | The selected service is configured in a service group on the project |
Active Project | The project is not disabled |
Valid Date Range | The current date falls within the project start and end dates |
If a matching active project is found, the job is automatically associated with that project.
Any new materials or equipment used during the job are also added to the project’s configuration.
Common Use Cases
1. Correcting a Missed Ticket
A job was completed, but the ticket was never created.
If the service, site, and project dates match, the system can still link the job to the correct project automatically.
2. Starting Work Before Full Setup
An organization may create a project and add services before tickets or scopes are fully scheduled.
Field users can begin work immediately, and the system will associate jobs with the active project as work is submitted.
Workflow benefit: Field teams can start work as soon as services are added to a project. The system organizes incoming job data and builds the project’s operational history without waiting for every ticket or scope to be manually scheduled first.
Tips and Best Practices
Best Practice | Why It Matters |
Review project dates before conversion | Dates control automatic project association |
Use scopes for seasonal or unpredictable work | Scopes are flexible and do not require fixed dates |
Use tickets for recurring scheduled visits | Tickets are best for work with known schedules |
Choose one primary action type when possible | Reduces confusion between tickets and scopes |
Adjust estimated hours after conversion | Helps reflect realistic crew sizes and visit durations |
Use scheduling preview before confirming | Helps catch skipped weeks, wrong dates, or month exclusions |
Configure expected materials and equipment before dispatch | Especially important if restrictions are enabled |
Use automatic project association for faster onboarding | Lets field teams start work while project setup continues |
Recommended Workflow
For most organizations, the recommended project workflow is:
Create and approve the estimate.
Confirm project start and end dates.
Convert the estimate to a project.
Review service groups.
Choose ticket or scope actions.
Configure contract invoices if needed.
Assign users where known.
Schedule tickets or prepare scopes.
Field users complete work in JobTrack.
Review actual labor, material, equipment, and billing information at the project level.
Summary
Projects are where approved work becomes operational in Viaesys.
They connect the estimate, service groups, tickets, scopes, field activity, materials, equipment, costs, and billing into one active workspace.
Use Tickets when work needs to be scheduled as individual visits. Use Scopes when work is planned but does not yet have fixed dates. Use automatic project association to allow field users to begin work quickly while still keeping jobs linked to the correct active project.